Kick out flashing is a small piece of metal flashing that diverts the water away from an intersection where a side wall and roof line meet.
Lp siding kickout flashing.
They used 4 inch wide flashing slip sheets for all the butt joints l or step flashing at rooflines and z flashing over all head trim and important fascia to siding transitions.
Between trim and roofing clean rain.
Roof chimney leak repair.
Kickout flashing replaces the first piece on step flashing and redirects water away from the siding ideally into a gutter.
Add a 4 inch wide adhesive flashing to flashing legs less than 4 inches.
Properly integrate flashing with the secondary wrb.
Of the kick out flashing.
Install step flashing that has a minimum 4 inch 102 mm upper leg.
Even if the roof has been properly flashed against the sidewall this one hasn t water can still run down the side of the house and behind the siding causing rot.
The third option is to have flashing at least 4 wide installed at the joints as long as the ends of the siding are factory finished and the siding is prefinished by an approved or preferred.
Install kick out flashing to direct the water into the gutter.
Apply sealant apply sealant and.
1 16 1 8.
Gutter do not run trim or siding inside.
Without a kickout water will eventually get behind the siding and into the wall where it will wreak havoc for years before you notice any signs of a leak.
Use housewrap flashing tape kick out flashing step flashing z flashing drip edge gutters or other items as needed to maintain the counter flashing principle.
Missing kick out flashing the photo to the right showcases missing kick out flashing on the roof.
See diagram 3b do not extend the siding or trim into the kick out flashing or gutter.
Lp siding minimum 1 clearance.
See diagram 3a maintain a minimum 1 inch 25 mm clearance between the end of the gutter and the adjoining wall to allow for proper maintenance of the siding.
All flashing materials must have a minimum 4 inch upper leg.